Architecture firm behind Ontario Science Centre slams closure - Action News
Home WebMail Sunday, December 29, 2024, 07:15 AM | Calgary | -9.6°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Toronto

Architecture firm behind Ontario Science Centre slams closure

The firm of the late architect who designed the Ontario Science Centre says the province's decision to immediately close its doors over a problem with the roof was "absurd" and motivated by politics rather than safety concerns.
Construction fencing surrounds the Ontario Science Centre on June 26, 2024.
Construction fencing surrounds the Ontario Science Centre after it was abruptly shuttered by the province on June 21, 2024. (Aloysius Wong/CBC)

The firm of the late architect who designed the Ontario Science Centre says the province's decision to immediately close its doors over a problem with the roof was "absurd" and motivated by politics rather than safety concerns.

Brian Rudy, a partner with Moriyama Teshima Architects, said news of the science centre's abrupt closure last week left them "dumbfounded."

"It's absurd to think that the whole building needs to be immediately shut down," Rudy told The Canadian Press. "It's so obviously a political move."

Raymond Moriyama, who died last year, designed the science centre that opened in 1969 on a ravine near the west branch of the Don River in Toronto's east end.

At a hastily called news conference last Friday, the Ministry of Infrastructure and Infrastructure Ontario announced the science centre would close by 4 p.m. due to health and safety concerns over the roof.

The closure sparked outrage from local residents, science lovers and opposition politicians. Many have called on the government to reverse course.

The province blamed failing roof panels made with a material called reinforced autoclaved aerated concrete, a lightweight form of concrete that was popular in the 1960s and '70s.

The government said it acted fast after receiving an engineer's report earlier in the week that laid out problems with the roof. The science centre's board decided to close the institution.

The report, written by the engineering firm Rimkus Consulting, did not recommend an immediate closure.

WATCH | Rudy on the state of the Science Centre:

Only 6% of Ontario Science Centre roof in 'urgent condition,' says architect from firm that designed it

2 months ago
Duration 1:19
The majority of panels needing repair at the Ontario Science Centre can be fixed through a series of small interventions, Brian Rudy, a partner with Moriyama Teshima Architects told CBC Radio's Metro Morning. His firm has offered to help coordinate repairs.

Roof issue 'has been known for years'

Some roof panels are at risk of collapse and Infrastructure Minister Kinga Surma said the engineers told government officials that the roof should be replaced in its entirety. That would take two to five years and cost upwards of $40 million.

Surma said it was a health-and-safety matter and that she was not "going to risk the safety of workers and children."

But Rudy said the roof panel problem should not have come as a surprise to the government.

"It needn't have been because it has been known for years," Rudy said. "This has been an issue identified decades ago."

Several reports over the years painted a sad story of the science centre's state of disrepair. Successive governments, from Progressive Conservatives to Liberals to New Democrats, deferred maintenance.

Rudy said his firm analyzed the engineer's report and he thinks there are a number of ways forward, and questioned the government's actions.

"It's not as urgent as they would let on," Rudy said.

"Most of the panels actually aren't even above exhibition spaces. So the urgency to close exhibition spaces is unfounded. In fact, all of the permanent exhibit spaces are free of this type of roof panel entirely, so it's not even a concern."

Rudy takes no issue with the thrust of the engineer's report.

"There's no doubt that repairs need to be made and that's no different than any building of this age," he said.

"Any building or museum of this size is going to have periodic maintenance at this age, so this is something that they know and that they do in phases, even if there are panels above public spaces. They're easy to rope off and make secure from public while the repairs are done."

WATCH |Hundreds of buildings use Science Centre roof panels and remain open:

Hundreds of Ontario buildings use Science Centre roof panels and remain open

2 months ago
Duration 2:05
The roofing material that triggered the closure of the Ontario Science Centre is used in hundreds of other public buildings across the province, including schools. But as CBCs Mike Crawley explains, those other buildings have not been closed over safety concerns.

Firm offers services free of charge

The firm wants the province to reverse its decision and has offered its services free of charge to help.

The province does not appear to be wavering. It is looking for an interim spot for the centre before a new one, half the size, opens at a redeveloped Ontario Place.

"The report proposes a single scope of work requiring both remediation and, in some areas, complete roof assembly and panel replacement," said Ash Milton, a spokesperson for Surma.

"This work has a potential cost of at least $22-40 million and would require a closure of the facility for more than two years. It would still not be open for the summer."

LISTEN | Inside the Science Centre right before it was shuttered:
The city of Toronto is still shocked by the Ford governments decision to close the Ontario Science Centre. There is now a change.org petition to have the Ontario Science Centre designated a heritage building.Many people in the tech industry have offered to donate money towards preserving the building as well, including world renowned Scientist Geoffrey Hinton. We sent our reporter Haydn Watters to the Science Centre. He spent the last few hours inside before it closed.

Milton said the full cost to repair everything at the science centre "would be at least $478 million."

"Our government is delivering a new, world-class facility for the OSC at Ontario Place, including 15 per cent more exhibition space, with completion as early as 2028," Milton said.

"In the interim, the OSC is exploring opportunities for alternative programming, such as mobile, pop-up experiences and virtual."

City council to debate OSC future Thursday

While the science centre is owned by the province, the land it is on is owned by the City of Toronto and the Toronto and Region Conservation Authority.

Premier Doug Ford has said the future of the site will be determined by the city.

The city is set to debate a motion Thursday about the province's responsibilities and the feasibility of operating the science centre at its current location.

The office of Toronto Mayor Olivia Chow said as part of the "new deal" with the province signed last year, the two sides agreed to "discuss partnership opportunities with the city for maintaining public, community-oriented science programming at the legacy Ontario Science Centre."